Skip to content
Activities You are here:
Home Activities
Removal of existing equipment from the well
Gas well leak test
Establishing gas well integrity
Installation of geothermal gravity heat pipe
Construction works
Electrical installation and installation of electrical equipment
Machine installations and installation of hardware
Technical inspection and obtaining an operating licence
Geothermal gravity heat pipe heat flow measurements
Simulation of the state in the rocks and well, and creation of a mathematical model and computer programme for the simulation of heat flow and mass flow of the heat carrier in the geothermal gravity heat pipe
Long-term monitoring of trial operations
Mapping of technical potential of abandoned oil and gas wells for construction of geothermal power plants
Preparation of guidelines for commercial production of electricity using existing abandoned wells
Go to Top