<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>News &#8211; SI Geo electricity</title>
	<atom:link href="https://si-geo-electricity.si/en/category/news/feed/" rel="self" type="application/rss+xml" />
	<link>https://si-geo-electricity.si</link>
	<description></description>
	<lastBuildDate>Thu, 16 May 2024 10:23:45 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.5.3</generator>
	<item>
		<title>Hungarian Delegation Visits the Čentiba Pilot Geothermal Power Plant</title>
		<link>https://si-geo-electricity.si/en/hungarian-delegation-visits-the-centiba-pilot-geothermal-power-plant/</link>
		
		<dc:creator><![CDATA[Mojca B]]></dc:creator>
		<pubDate>Thu, 16 May 2024 10:23:45 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://si-geo-electricity.si/?p=2243</guid>

					<description><![CDATA[On May 13, 2024, a Hungarian delegation visit the first Slovenian pilot geothermal power plant, managed by Dravske Elektrarne Maribor and Petrol Geo, with project partners participation. The delegation included Hungary&#8217;s Minister of Energy Csaba Lantos, State Secretaries Dr. Gabor Czepek and Attila Steiner, the Hungarian Ambassador to Slovenia Andor David, and the Hungarian Consul&#8230;]]></description>
										<content:encoded><![CDATA[<p>On May 13, 2024, a Hungarian delegation visit the first Slovenian pilot geothermal power plant, managed by Dravske Elektrarne Maribor and Petrol Geo, with project partners participation. The delegation included Hungary&#8217;s Minister of Energy Csaba Lantos, State Secretaries Dr. Gabor Czepek and Attila Steiner, the Hungarian Ambassador to Slovenia Andor David, and the Hungarian Consul General in Lendava Gertrud Kelemen. General Director of DEM, Mag. Damjan Seme, presented the operation of the pilot geothermal power plant and other strategic, implementation, and development-innovative projects of the company in the field of utilizing renewable energy sources for electricity production during the green transition.</p>
<p>The pilot geothermal power plant project is based on the use of a completely new method of electricity production using a geothermal gravity heat pipe (Slovenian patent SI 26426 A). The unique aspect of using a geothermal gravity heat pipe is in its closed circuit, requiring only one dry well for operation. An existing but non-productive well Pg-8 in the settlement of Čentiba in Lendava is being utilized.</p>
<p>Dravske Elektrarne Maribor, the largest producer of electricity from renewable sources within the HSE Group, began underground work at the end of 2022 to restore the non-productive Pg-8 well, well of three thousand meters deep, Aboveground work, including construction and electro-mechanical installations, started in April 2023.</p>
<p>Recently, we produced the first kWh of electricity; however, consistent operation in the future will require modifications to the turbine part of the equipment, as tests have shown that the power plant currently cannot operate continuously with the thermal output of the Pg-8 well. Future steps are therefore focused on finding solutions that will enable more consistent turbine operation under given conditions, as directed by the initial results of the pilot innovative project.</p>
<p>Mag. Damjan Seme, General Director of Dravske Elektrarne Maribor, said: &#8220;Despite some challenges we face with the pilot geothermal power plant project, I am proud that Dravske Elektrarne Maribor, together with partners, is pioneering the field of deep geothermal utilization. We have brought the project to the point where the first kilowatt-hours of electricity have been produced. I believe that by modifying the turbine equipment, we will achieve a state that allows for consistent operation and production, paving the way for future similar projects. I am pleased that our neighbors are also interested in the project, and today we exchanged views and opinions, opening the door to cooperation in the field of deep geothermal energy utilization for electricity production.&#8221;</p>
<p>Hungary has been among the top five countries in Europe in the direct utilization of geothermal energy for many years. Since the beginning of the last decade, the extraction of geothermal energy has increased more than fourfold, but we still see plenty of opportunities to enhance its utilization, building on our favourable conditions – emphasized Csaba Lantos. The Hungarian Minister of Energy explained, &#8220;In order to further progress, we have prepared the National Geothermal Strategy, which is currently being finalized. According to the guiding document, we plan to double energy usage by 2030. The new applications could replace 1-1.2 billion cubic meters of natural gas by 2035. The planned measures and developments could make geothermal energy a leading sector in the Hungarian green economy. We strive to follow the best international practices in energy investments planning, and the current visit to Slovenia is about mutually beneficial exchange of experiences.”</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Presentation of the SI-Geo-Electricity project to the InnoGeoPot Partners</title>
		<link>https://si-geo-electricity.si/en/presentation-of-the-si-geo-electricity-project-to-the-innogeopot-partners/</link>
		
		<dc:creator><![CDATA[Mojca B]]></dc:creator>
		<pubDate>Thu, 16 May 2024 10:22:23 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://si-geo-electricity.si/?p=2240</guid>

					<description><![CDATA[On Monday, May 13, 2024, seven representatives from the Geological Survey of Slovenia, the Faculty of Mining, Geology, and Petroleum Engineering in Zagreb, and the Applied and Environmental Geology Group at the University of Basel in Switzerland visited a pilot geothermal power plant in Slovenia. The visit was part of an excursion for the joint&#8230;]]></description>
										<content:encoded><![CDATA[<p>On Monday, May 13, 2024, seven representatives from the Geological Survey of Slovenia, the Faculty of Mining, Geology, and Petroleum Engineering in Zagreb, and the Applied and Environmental Geology Group at the University of Basel in Switzerland visited a pilot geothermal power plant in Slovenia. The visit was part of an excursion for the joint research project InnoGeoPot, exploring the possibility of converting existing wells into deep heat exchangers (geosondes) for the purposes of heat production or underground heat storage. The project also develops a decision-making system for the cross-border Slovenian-Croatian area and the urban centers of Ljubljana and Zagreb. The experiences, development methods, and technical modifications of the existing well Pg-8 for the pilot power plant are extremely important for the approach of the new InnoGeoPot project, even though the latter&#8217;s target applications and depths are less demanding and smaller.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>THE PILOT GEOTHERMAL POWER PLANT PROJECT ČENTIBA IS APPROACHING COMPLETION</title>
		<link>https://si-geo-electricity.si/en/the-pilot-geothermal-power-plant-project-centiba-is-approaching-completion/</link>
		
		<dc:creator><![CDATA[Mojca B]]></dc:creator>
		<pubDate>Thu, 16 May 2024 10:19:35 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://si-geo-electricity.si/?p=2238</guid>

					<description><![CDATA[Dravske Elektrarne Maribor, the largest producer of electricity from renewable sources within the HSE Group, began underground work at the end of 2022 to reconstruct the non-productive Pg-8 well, well of three thousand meters deep, Aboveground work, including construction and electro-mechanical installations, started in April 2023. According to the initial plans, the startup tests were&#8230;]]></description>
										<content:encoded><![CDATA[<p>Dravske Elektrarne Maribor, the largest producer of electricity from renewable sources within the HSE Group, began underground work at the end of 2022 to reconstruct the non-productive Pg-8 well, well of three thousand meters deep, Aboveground work, including construction and electro-mechanical installations, started in April 2023.</p>
<p>According to the initial plans, the startup tests were scheduled for early autumn. However, the reconstruction of the Pg-8 well was prolonged as we encountered problems at a depth of 1,600 meters with the removal of the separating part (the so-called packer). Further delays were also caused by the need to remove water from the well (during the cleaning and leak testing process, the well was filled with water), as it must be dry to add the working fluid required for operation. Currently, there are still approximately ten cubic meters of water in the borehole, which is being removed through evaporation. This process is lengthy but completely environmentally friendly. Due to the extended time required for this procedure, the planned startup tests have been postponed to the winter months, about which we will inform the media and the public.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Presentation of the pilot geothermal power plant at the international summer geothermal school</title>
		<link>https://si-geo-electricity.si/en/presentation-of-the-pilot-geothermal-power-plant-at-the-international-summer-geothermal-school/</link>
		
		<dc:creator><![CDATA[Mojca B]]></dc:creator>
		<pubDate>Tue, 25 Jul 2023 10:24:53 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://si-geo-electricity.si/?p=2223</guid>

					<description><![CDATA[On Tuesday, July 4, 2023, participants of the Second International Summer Geothermal School in Ljubljana visited the headquarters of Petrol Geo Ltd. and the abandoned gas well Pg-8, where DEM, Petrol Geo Ltd., the University of Maribor, and GeoZS are testing a pilot geothermal power plant under the Si-Geo-Electricity project. Professor Goričanec from UM FKKT&#8230;]]></description>
										<content:encoded><![CDATA[<p>On Tuesday, July 4, 2023, participants of the Second International Summer Geothermal School in Ljubljana visited the headquarters of Petrol Geo Ltd. and the abandoned gas well Pg-8, where DEM, Petrol Geo Ltd., the University of Maribor, and GeoZS are testing a pilot geothermal power plant under the Si-Geo-Electricity project. Professor Goričanec from UM FKKT presented the innovative technical design of the electricity generation project from the abandoned hydrocarbon well, while Renata Kevrič highlighted the role of Petrol Geo Ltd. in transitioning from fossil fuel extraction to harnessing deep geothermal energy. On-site, under the guidance of DEM and GeoZS, they observed the status of the power plant&#8217;s construction.</p>
<p>This visit was organized as part of the excursion of the summer school on &#8220;Advancements in the Development of Geothermal Energy Utilization for Heating, Cooling, and Electricity Production,&#8221; which took place from July 3 to 8, 2023. It was jointly organized by the Geological Survey of Slovenia and the Faculty of Natural Sciences and Engineering at the University of Ljubljana, with support from the Icelandic School of Energy in Reykjavik and co-financing from the EEA project INFO-GEOTHERMAL and the COST project Geothermal-DHC. The event hosted ten lecturers from seven countries and 24 participants from 13 countries in Africa, Europe, and North America. The attendees were introduced with the development of new geothermal projects, best practices in research, innovative geothermal energy utilization technologies, and optimization of operations and resource management to minimize the impact on the environment and human beings in a sustainable manner.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>On the abandoned well Pg-8, the company Petrol Geo, started underground construction work as a part of the Čentiba pilot geothermal power plant</title>
		<link>https://si-geo-electricity.si/en/on-the-abandoned-well-pg-8-the-company-petrol-geo-started-underground-construction-work-as-a-part-of-the-centiba-pilot-geothermal-power-plant/</link>
		
		<dc:creator><![CDATA[Mojca B]]></dc:creator>
		<pubDate>Mon, 30 Jan 2023 13:28:20 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://si-geo-electricity.si/?p=2194</guid>

					<description><![CDATA[On the abandoned well Pg-8, the company Petrol Geo, started underground construction work as a part of the Čentiba pilot geothermal power plant, for which Dravske elektrarne Maribor from HSE group, received a construction permit in May 2022. The keynote speaker of official underground construction works opening was dr. Aleksander Jevšek, Minister for Development and&#8230;]]></description>
										<content:encoded><![CDATA[<p><strong>On the abandoned well Pg-8, the company Petrol Geo, started underground construction work as a part of the Čentiba pilot geothermal power plant, for which Dravske elektrarne Maribor from HSE group, received a construction permit in May 2022. The keynote speaker of official underground construction works opening was dr. Aleksander Jevšek, Minister for Development and European Cohesion Policy.</strong></p>
<p>Pilot geothermal power plant in Čentiba in Municipality of Lendava will utilize the geothermal energy potential of the existing non-productive well Pg-8, around three thousand meters long. The fluid (ammonia) circulates in a completely closed system, which disable any contacts with the surrounding rocks. Well Pg-8 is steel cased and cemented, and as such completely sealed. Pilot geothermal power plant at the Pg-8 well will consist of an underground part, i.e. of the geothermal gravity heat pipe and the above-ground part, i.e. cooling system and turbine micro system.</p>
<p><strong>The underground works include the removal of the existing pipes, for which a special equipment has been mobilized. Activities that will follow are: well gas-sealing check, geothermal gravity heat pipe installing and the gas-sealing check of the space between the pipes in the well. Underground works are being performed in accordance with the mining project.</strong></p>
<p>After completed underground works, activities on the above-ground part of pilot geothermal power plant construction will begin, namely (i) construction work (three building bases, and sewerage, water and electrical lines), (ii) work on electrical and mechanical installation, (iii) modeling and long-term monitoring of trial operation, (iv) geothermal potential of abandoned oil and gas wells assessment in Slovenia and (v) guidelines for the new project development preparation. Start-up tests of first geothermal power plant in Slovenia are planned for June this year.</p>
<p><strong>Practically confirmed new designed concept will enable utilization of other abandoned wells in Slovenia as well as abandoned wells around the world.</strong></p>
<p><iframe title="DEM Si Geo Elecrticity" width="1200" height="675" src="https://www.youtube.com/embed/HRNpr7plAYM?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe></p>
<p>&nbsp;</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>CONFERENCE ON PROMOTING GEOTHERMAL ENERGY BASED ON GOOD PRACTICE</title>
		<link>https://si-geo-electricity.si/en/conference-on-promoting-geothermal-energy-based-on-good-practice/</link>
		
		<dc:creator><![CDATA[Mojca B]]></dc:creator>
		<pubDate>Mon, 05 Dec 2022 11:08:38 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://si-geo-electricity.si/?p=2182</guid>

					<description><![CDATA[On November 30, 2022, a CONFERENCE ON PROMOTING GEOTHERMAL ENERGY BASED ON GOOD PRACTICE (INFO-GEOTHERMAL project) was held in Beltinci. The goal of the INFO-GEOTHERMAL project is to support the efficient cascading use of geothermal energy through access to official and public information in Slovenia. The municipalities and Ministry of the Environment and Space presented&#8230;]]></description>
										<content:encoded><![CDATA[<p>On November 30, 2022, a CONFERENCE ON PROMOTING GEOTHERMAL ENERGY BASED ON GOOD PRACTICE (INFO-GEOTHERMAL project) was held in Beltinci. The goal of the INFO-GEOTHERMAL project is to support the efficient cascading use of geothermal energy through access to official and public information in Slovenia. The municipalities and Ministry of the Environment and Space presented their roles in geothermal energy projects. SI-Geo-electricity and GEOFOOD projects were presented as a good practice of using geothermal energy in Slovenia. Guided tour to the geothermal doublet and heating system of ten public buildings in Lenti, Hungary was organized. Heating system was built in 2021 with the production of 8,344 GJ of renewable heat per year. Project was entirely financed by the structural funds of the European Union. The total amount was approx. 3 million euros.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Project presentation in Iceland</title>
		<link>https://si-geo-electricity.si/en/project-presentation-in-iceland/</link>
		
		<dc:creator><![CDATA[Mojca B]]></dc:creator>
		<pubDate>Thu, 17 Nov 2022 12:58:49 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://si-geo-electricity.si/?p=2179</guid>

					<description><![CDATA[Nina Rman, Ph. D., representative of GeoZS, presented Si-Geo-Electricity project on 25 October 2022 in Reykjavik, Iceland. Workshop of a case studies on reinjection, cascading technologies and binary geothermal power plants was organized as part of the INFO-GEOTHERMAL project, being funded through the same financial mechanism as Si-Geo-Electricity. The event was attended by 18 representatives&#8230;]]></description>
										<content:encoded><![CDATA[<p>Nina Rman, Ph. D., representative of GeoZS, presented Si-Geo-Electricity project on 25 October 2022 in Reykjavik, Iceland. Workshop of a case studies on reinjection, cascading technologies and binary geothermal power plants was organized as part of the INFO-GEOTHERMAL project, being funded through the same financial mechanism as Si-Geo-Electricity. The event was attended by 18 representatives of Slovenian ministries, municipalities, agencies, research institutes and companies, as well as 30 representatives of organizations of the same profile based in Iceland. The presentation attracted a lot of interest, especially from South America and Africa participants, which are also looking for abandoned oil and gas wells solutions.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Online presentation of experiences and current events related to geothermal energy in Slovenia</title>
		<link>https://si-geo-electricity.si/en/online-presentation-of-experiences-and-current-events-related-to-geothermal-energy-in-slovenia/</link>
		
		<dc:creator><![CDATA[Mojca B]]></dc:creator>
		<pubDate>Thu, 17 Nov 2022 12:57:16 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://si-geo-electricity.si/?p=2177</guid>

					<description><![CDATA[On Wednesday, 23 November 2002, at 4 p.m., there will be an online presentation of experiences and current events related to geothermal energy in Slovenia, presented by representatives of GeoZS and DEM. The event is organized by the IGCP 636 project. More information about the project is available at the link: https://en.unesco.org/international-geoscience-programme/projects/636 Numerous countries already&#8230;]]></description>
										<content:encoded><![CDATA[<p>On Wednesday, 23 November 2002, at 4 p.m., there will be an online presentation of experiences and current events related to geothermal energy in Slovenia, presented by representatives of GeoZS and DEM. The event is organized by the IGCP 636 project.</p>
<p>More information about the project is available at the link: <a href="https://en.unesco.org/international-geoscience-programme/projects/636">https://en.unesco.org/international-geoscience-programme/projects/636</a></p>
<p>Numerous countries already presented their experiences (Spain, Italy, Canada, Colombia etc.). Their presentations are available on google docs with registered access to the geotheroom portal: <a href="https://docs.google.com/forms/d/e/1FAIpQLSd0qBQJz4M6oeRy3XEhFIxYM6bG092aAkufb8FRI2KLh0i65w/viewform">https://docs.google.com/forms/d/e/1FAIpQLSd0qBQJz4M6oeRy3XEhFIxYM6bG092aAkufb8FRI2KLh0i65w/viewform</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Energy Symposium of the HSE Group</title>
		<link>https://si-geo-electricity.si/en/energy-symposium-of-the-hse-group/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 04 Nov 2022 14:26:08 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://si-geo-electricity.si/?p=2086</guid>

					<description><![CDATA[is the leading Slovenian company in the field of exploration, production and maintenance of oil, gas and geothermal wells in Slovenia. After the discovery of oil, gas, mineral water, and geothermal resources in northeastern Slovenia, the company also became a producer of hydrocarbons and geothermal energy. Petrol Geo is the only qualified contractor of mining&#8230;]]></description>
										<content:encoded><![CDATA[<p>is the leading Slovenian company in the field of exploration, production and maintenance of oil, gas and geothermal wells in Slovenia. After the discovery of oil, gas, mineral water, and geothermal resources in northeastern Slovenia, the company also became a producer of hydrocarbons and geothermal energy. Petrol Geo is the only qualified contractor of mining works for deep geothermal wells in Slovenia, and as part of which works a professionally qualified team for projecting and managing projects in accordance with mining legislation and applicable international standards, which includes management of works in the field of geotechnology and the execution of deep well drilling.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
